Please don't order less than 30 squares. The Brava Cedar Shake Starter is used at all eaves. The Brava Cedar Shake Starter protect the first row of Brava Cedar Shake field tiles and protect against wind-driven rain and high winds. It is important to also use when pitch of roof changes within the same roof facet. Lead time is 5 months. High UV is for altitudes over 6,000 feet in elevation.
Miami-Dade Approved. Florida Building Code Approval (FBC). TDI Approval. Title 24 / Cool Roof Approval. International Building Code Compliant. International Residential Code Compliant.
Impact Rating: Class 4 (the highest rating)
Fire Resistance: Class C is standard, Class A costs extra
Starter Piece Coverage: 12 inches of coverage